Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Non-Compliance detail
Summary
Licence number:
779
Annual Return Start:
01 Jul 2021
Annual Return End:
30 Jun 2022
Date Received:
25 Aug 2022
Licence Condition number
Type of non-compliance
EPA actions
No. of times occurred
Alleged breach of co
Intermittent discharge of seepage from the Lake Liddell Dam in a location which is not a licenced discharge point under the EPL.
EPA action determined as part of scheduled inspection program
1
M2.1
During the second six months emissions monitoring, sulphuric acid mist and sulphur trioxide (as SO3) were inadvertently excluded for points 5 and 11. As a result, the analytes were only sampled once during the reporting period for points 5 and 11.
EPA action determined as part of scheduled inspection program
1
L3.5a
The 99th percentile limit of 1,100 milligrams per cubic metre for nitrogen oxides was exceeded at monitoring point 6.
EPA action determined as part of scheduled inspection program
1
Alleged breach of Co
Release of Lime Softening Sludge from the Lime Softening Plant.
EPA action determined as part of scheduled inspection program
1
E1.3
Exceedance of the hourly volume discharge limit applying to point 23 under condition E1.3 of the EPL.
EPA action determined as part of scheduled inspection program
1