Non-Compliance detail


  
Summary
 
Licence number: 779
Annual Return Start: 01 Jul 2021
Annual Return End: 30 Jun 2022
Date Received: 25 Aug 2022
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
Alleged breach of co Intermittent discharge of seepage from the Lake Liddell Dam in a location which is not a licenced discharge point under the EPL. EPA action determined as part of scheduled inspection program 1
M2.1 During the second six months emissions monitoring, sulphuric acid mist and sulphur trioxide (as SO3) were inadvertently excluded for points 5 and 11. As a result, the analytes were only sampled once during the reporting period for points 5 and 11. EPA action determined as part of scheduled inspection program 1
L3.5a The 99th percentile limit of 1,100 milligrams per cubic metre for nitrogen oxides was exceeded at monitoring point 6. EPA action determined as part of scheduled inspection program 1
Alleged breach of Co Release of Lime Softening Sludge from the Lime Softening Plant. EPA action determined as part of scheduled inspection program 1
E1.3 Exceedance of the hourly volume discharge limit applying to point 23 under condition E1.3 of the EPL. EPA action determined as part of scheduled inspection program 1